Corporate / Commercial

Enterprise Infrastructure Across Multiple Facilities

Keruen — Administrative Buildings
1,500 ports at primary site2011–2013 · Almaty, Kazakhstan

CASE STUDY

Broad engineering scope across corporate facilities, combining network, power, safety, security and media distribution.

  • Structured Cabling
  • Electrical
  • Security
  • Fire & Life Safety
  • TV Distribution
01

The challenge

Deliver multiple building technology systems as one coordinated infrastructure program.

02

Scope delivered

Electrical; structured cabling (1,500 ports at Omarova site, 200 at Luganskogo site); intrusion alarm; fire alarm; voice notification; CCTV; access control; satellite and terrestrial TV.

03

The result

A multi-system corporate platform designed for centralized operation and long-term serviceability.

PROJECT TIMELINE

Engineering progress over time.

01

2011–2012: Omarova 8

02

2012–2013: Luganskogo 96